C&D Contracting: Upcoming Opportunities

Updated May 4, 2023

Projects to be solicited through June 2023

Under $25 million

Project

Method

Agency

Boiler Replacement: LaGuardia & Spring Creek Bus Depots

DBB (A+B)

MTA Bus

Boring Services: Various Locations System-wide

DBB (IFB)

NYC Transit

Generator Replacement: Spring Creek & College Point Bus Depots

DBB (A+B)

MTA Bus

Metro-North Radio System Upgrade

Design-Build

Metro-North Railroad

Sandy Resiliency: Corona Yard

DBB (A+B)

NYC Transit

Stormwater Mitigation (Street Stairs Package 2): 11 Stations in Manhattan, the Bronx, Queens, and Brooklyn

DBB (A+B)

NYC Transit

Sutphin Blvd-Archer Av: Comm and Security Upgrades

DBB (A+B)

NYC Transit

Test Pits: Various Locations System-wide

DBB (IFB)

NYC Transit

Upper Level North Abutment & Retaining Wall Reconstruction & Bike/Pedestrian Access Ramp: Henry Hudson Bridge

DBB (A+B)

MTA Bridges & Tunnels

Between $25 million and $100 million

Project

Method

Agency

Emergency Alarms Phase 1: Various Locations System-wide

Design-Build

NYC Transit

Mainline Switch Rehabilitation: Staten Island Railway

DBB (A+B)

NYC Transit

Passenger ID CCTV: 108 Locations System-wide

Design-Build

NYC Transit

Police District Office Rehabilitation: 14 St-Union Square

Design-Build

NYC Transit

Replace 17 Elevators: 8 Stations (Atlantic Av and Dekalb Av / 4 Avenue Line, Atlantic Av and Utica Av / Eastern Parkway Line, Atlantic Av and Prospect Park / Brighton Line, Church Av / Nostrand Line, Stillwell Av / Coney Island Terminal)

Design-Build

NYC Transit

Replace 20 Elevators: 9 Stations (Fordham Road / Jerome Line; 14 St / 8 Avenue Line; 66 St and 72 St / Broadway-7 Avenue Line; Canal St / Lexington Avenue Line; Main Street / Flushing Line; Roosevelt Av, Queens Plaza, and 179 St / Queens Boulevard Line)

Design-Build

NYC Transit

Sandy Resiliency: 4 Pump Rooms - Jerome/Pelham Tube

DBB (A+B)

NYC Transit

Structural Painting and Repair: Myrtle Line Outstanding Work

DBB (A+B)

NYC Transit

Over $100 million

Project

Method

Agency

ADA at Forest Hills and Platform Replacement at Babylon

Design-Build

Long Island Rail Road

ADA NYCT Package 5: 13 Stations on Various Lines

Design-Build

NYC Transit

Line Structure Component Repairs, Stormwater Mitigation, & Repair Expansion Joints: Broadway-7 Avenue Line / 8 Avenue Line

DBB (A+B)

NYC Transit

Replace 21 Escalators: 6 Stations (51 St / Lexington Avenue Line, Park Place / Clark St Line, High St / 8 Avenue Line, Franklin Av / Franklin Avenue Shuttle, Lexington Av and 21 Street / 63 St Line)

Design-Build

NYC Transit

Southeast Parking Improvements: Brewster Yard

Design-Build

Metro-North Railroad

Station Renewals: Chambers St / Nassau Line & 190 St / 8 Avenue Line

Design-Build

NYC Transit

Structural Painting and Repair: 9 Av Portal - Stillwell & Structural Repairs: 9 Av / West End Line

DBB (A+B)

NYC Transit

Projects to be solicited through December 2023

Under $25 million

Project

Method

Agency

APC Power Plant Replacement & HVAC: Communications Rooms System-wide

DBB (A+B)

NYC Transit

Construct Pump Room: Rockwell Place / 4 Avenue Line

DBB (A+B)

NYC Transit

Deep Wells Back-flushing: Fulton and Crosstown Lines

DBB (A+B)

NYC Transit

Demolition of Abandoned Structures: Various Locations System-wide

DBB (A+B)

NYC Transit

East Yaphank Station Relocation

DBB (A+B)

Long Island Rail Road

Elevator Replacement: Kingsbridge & Michael J. Quill Bus Depots

TBD

NYC Transit

Fresh Pond Yard Lighting and Fencing

DBB (A+B)

NYC Transit

HVAC, Fire Control, & CNG Upgrades: Spring Creek & College Point Bus Depots

DBB (A+B)

MTA Bus

HVAC: East New York & Queens Village Depots

DBB (A+B)

NYC Transit

Rehabilitate Substation Roofs and Enclosures: 4 Locations / Flushing, Astoria, Jamaica, and Lexington Avenue Lines

DBB (A+B)

NYC Transit

Rehabilitation of Emergency Exits: Various Locations System-wide

Design-Build

NYC Transit

Replace High Tension Switchgear at 2 Substations / Culver Line

DBB (A+B)

NYC Transit

Sandy Resiliency: Pump Room Enhancements at 9 Locations / 8 Avenue, Concourse, Broadway-7 Avenue, and Lexington Avenue Lines

DBB (A+B)

NYC Transit

Sandy Resiliency: Site Improvements at 4 Locations / Flushing, Broadway-7 Avenue, Dyre, and 4 Avenue Lines

DBB (A+B)

NYC Transit

Stormwater Mitigation (Miscellaneous Vulnerabilities): Various Locations System-wide

DBB (A+B)

NYC Transit

Subway Facility Heating & Energy Efficiency Boiler Upgrades at Concourse Yard, Coney Island Yard, 240 St Maintenance Facility, Jerome Maintenance Facility, Tiffany Shop, East 180 St Yard, and East New York Maintenance Facility

TBD

NYC Transit

Upgrade / Replace Elevators: Various Department of Subways Facilities

DBB (A+B)

NYC Transit

Upgrade / Replace Private Branch Exchange (PBX): Jay St

DBB (A+B)

NYC Transit

Water Conditions Remedy: Various Locations

DBB (A+B)

NYC Transit

Between $25 million and $100 million

Project

Method

Agency

Car Washer Component Repairs: Canarsie, Jamaica & 207 St

DBB (A+B)

NYC Transit

Component Repairs: Various Fan Plants System-wide

DBB (A+B)

NYC Transit

Component Roof Repairs: Coney Island Overhaul Shop

DBB (A+B)

NYC Transit

Component Upgrades at Various Bus Depots: Castleton, Michael J. Quill, Gun Hill, Jackie Gleason, Ulmer Park, Kings Bridge, Charleston, and Flatbush Depots

DBB (A+B)

NYC Transit

Connection-Oriented Ethernet (COE), Phase 3C: System-wide

DBB (A+B)

NYC Transit

Fire Stand Pipe Phase 2: Grand Central Terminal

DBB (A+B)

Metro-North Railroad

Line Structure Component Repairs: Downtown Manhattan / Broadway and Nassau Lines

DBB (A+B)

NYC Transit

Rehabilitate Garretson Ave Bridge, Overcoat 6 SIR Bridges (Thompson Street, Wave Street, Water Street, Bay Street, Prospect Street, and Canal Street), Rehabilitate Stapleton Viaduct, and SIR Station Component Program at 7 stations (St. George, Stapleton, Grasmere, Old Town, Dongan Hills, Grant City, Oakwood Heights)

DBB (A+B)

NYC Transit

Rehabilitate Pump Rooms: 4 Locations / Broadway, Astoria, Brighton, and Canarsie Lines

DBB (A+B)

NYC Transit

Rehabilitation of 6 Circuit Breaker Houses: Various Locations in Brooklyn and Queens

DBB (A+B)

NYC Transit

Sandy Repairs: Power Repairs at Various Locations System-wide

DBB (A+B)

NYC Transit

Sandy Resiliency (Outstanding Street Level Openings): Various Locations System-wide

DBB (A+B)

NYC Transit

Sandy Resiliency and Drainage Improvements: Westchester Yard

DBB (A+B)

NYC Transit

Second Avenue Subway Phase 2: Early Works / Utility Relocation

DBB (A+B)

C&D

Structural Painting and Repair: Portal to Kings Hwy / Culver Line

DBB (A+B)

NYC Transit

Substation Renewal: Washington Heights and Village

DBB (A+B)

NYC Transit

Switch Replacement for CBTC 6 Avenue & 63rd St Lines

Design-Build

NYC Transit

Switch Replacement for CBTC Fulton Line

TBD

NYC Transit

Over $100 million

Project

Method

Agency

Communications Based Train Control (CBTC): 6 Av and 63rd St Lines

Design-Build

NYC Transit

Sandy Repairs: Culver Yard

DBB (A+B)

NYC Transit

Second Avenue Subway Phase 2: Tunnel Boring Machine and Caverns

Design-Build

C&D

Station Component Repairs: Various Locations

Design-Build

NYC Transit

Structural Painting and Repair: 225 St - 240 St / Broadway-7 Avenue Line and Queensboro Plaza - 33 St / Flushing Line

DBB (A+B)

NYC Transit