Projects to be solicited through June 2023
Under $25 million
Project |
Method |
Agency |
---|---|---|
Boiler Replacement: LaGuardia & Spring Creek Bus Depots |
DBB (A+B) |
MTA Bus |
Boring Services: Various Locations System-wide |
DBB (IFB) |
NYC Transit |
Generator Replacement: Spring Creek & College Point Bus Depots |
DBB (A+B) |
MTA Bus |
Metro-North Radio System Upgrade |
Design-Build |
Metro-North Railroad |
Sandy Resiliency: Corona Yard |
DBB (A+B) |
NYC Transit |
Stormwater Mitigation (Street Stairs Package 2): 11 Stations in Manhattan, the Bronx, Queens, and Brooklyn |
DBB (A+B) |
NYC Transit |
Sutphin Blvd-Archer Av: Comm and Security Upgrades |
DBB (A+B) |
NYC Transit |
Test Pits: Various Locations System-wide |
DBB (IFB) |
NYC Transit |
Upper Level North Abutment & Retaining Wall Reconstruction & Bike/Pedestrian Access Ramp: Henry Hudson Bridge |
DBB (A+B) |
MTA Bridges & Tunnels |
Between $25 million and $100 million
Project |
Method |
Agency |
---|---|---|
Emergency Alarms Phase 1: Various Locations System-wide |
Design-Build |
NYC Transit |
Mainline Switch Rehabilitation: Staten Island Railway |
DBB (A+B) |
NYC Transit |
Passenger ID CCTV: 108 Locations System-wide |
Design-Build |
NYC Transit |
Police District Office Rehabilitation: 14 St-Union Square |
Design-Build |
NYC Transit |
Replace 17 Elevators: 8 Stations (Atlantic Av and Dekalb Av / 4 Avenue Line, Atlantic Av and Utica Av / Eastern Parkway Line, Atlantic Av and Prospect Park / Brighton Line, Church Av / Nostrand Line, Stillwell Av / Coney Island Terminal) |
Design-Build |
NYC Transit |
Replace 20 Elevators: 9 Stations (Fordham Road / Jerome Line; 14 St / 8 Avenue Line; 66 St and 72 St / Broadway-7 Avenue Line; Canal St / Lexington Avenue Line; Main Street / Flushing Line; Roosevelt Av, Queens Plaza, and 179 St / Queens Boulevard Line) |
Design-Build |
NYC Transit |
Sandy Resiliency: 4 Pump Rooms - Jerome/Pelham Tube |
DBB (A+B) |
NYC Transit |
Structural Painting and Repair: Myrtle Line Outstanding Work |
DBB (A+B) |
NYC Transit |
Over $100 million
Project |
Method |
Agency |
---|---|---|
ADA at Forest Hills and Platform Replacement at Babylon |
Design-Build |
Long Island Rail Road |
ADA NYCT Package 5: 13 Stations on Various Lines |
Design-Build |
NYC Transit |
Line Structure Component Repairs, Stormwater Mitigation, & Repair Expansion Joints: Broadway-7 Avenue Line / 8 Avenue Line |
DBB (A+B) |
NYC Transit |
Replace 21 Escalators: 6 Stations (51 St / Lexington Avenue Line, Park Place / Clark St Line, High St / 8 Avenue Line, Franklin Av / Franklin Avenue Shuttle, Lexington Av and 21 Street / 63 St Line) |
Design-Build |
NYC Transit |
Southeast Parking Improvements: Brewster Yard |
Design-Build |
Metro-North Railroad |
Station Renewals: Chambers St / Nassau Line & 190 St / 8 Avenue Line |
Design-Build |
NYC Transit |
Structural Painting and Repair: 9 Av Portal - Stillwell & Structural Repairs: 9 Av / West End Line |
DBB (A+B) |
NYC Transit |
Projects to be solicited through December 2023
Under $25 million
Project |
Method |
Agency |
---|---|---|
APC Power Plant Replacement & HVAC: Communications Rooms System-wide |
DBB (A+B) |
NYC Transit |
Construct Pump Room: Rockwell Place / 4 Avenue Line |
DBB (A+B) |
NYC Transit |
Deep Wells Back-flushing: Fulton and Crosstown Lines |
DBB (A+B) |
NYC Transit |
Demolition of Abandoned Structures: Various Locations System-wide |
DBB (A+B) |
NYC Transit |
East Yaphank Station Relocation |
DBB (A+B) |
Long Island Rail Road |
Elevator Replacement: Kingsbridge & Michael J. Quill Bus Depots |
TBD |
NYC Transit |
Fresh Pond Yard Lighting and Fencing |
DBB (A+B) |
NYC Transit |
HVAC, Fire Control, & CNG Upgrades: Spring Creek & College Point Bus Depots |
DBB (A+B) |
MTA Bus |
HVAC: East New York & Queens Village Depots |
DBB (A+B) |
NYC Transit |
Rehabilitate Substation Roofs and Enclosures: 4 Locations / Flushing, Astoria, Jamaica, and Lexington Avenue Lines |
DBB (A+B) |
NYC Transit |
Rehabilitation of Emergency Exits: Various Locations System-wide |
Design-Build |
NYC Transit |
Replace High Tension Switchgear at 2 Substations / Culver Line |
DBB (A+B) |
NYC Transit |
Sandy Resiliency: Pump Room Enhancements at 9 Locations / 8 Avenue, Concourse, Broadway-7 Avenue, and Lexington Avenue Lines |
DBB (A+B) |
NYC Transit |
Sandy Resiliency: Site Improvements at 4 Locations / Flushing, Broadway-7 Avenue, Dyre, and 4 Avenue Lines |
DBB (A+B) |
NYC Transit |
Stormwater Mitigation (Miscellaneous Vulnerabilities): Various Locations System-wide |
DBB (A+B) |
NYC Transit |
Subway Facility Heating & Energy Efficiency Boiler Upgrades at Concourse Yard, Coney Island Yard, 240 St Maintenance Facility, Jerome Maintenance Facility, Tiffany Shop, East 180 St Yard, and East New York Maintenance Facility |
TBD |
NYC Transit |
Upgrade / Replace Elevators: Various Department of Subways Facilities |
DBB (A+B) |
NYC Transit |
Upgrade / Replace Private Branch Exchange (PBX): Jay St |
DBB (A+B) |
NYC Transit |
Water Conditions Remedy: Various Locations |
DBB (A+B) |
NYC Transit |
Between $25 million and $100 million
Project |
Method |
Agency |
---|---|---|
Car Washer Component Repairs: Canarsie, Jamaica & 207 St |
DBB (A+B) |
NYC Transit |
Component Repairs: Various Fan Plants System-wide |
DBB (A+B) |
NYC Transit |
Component Roof Repairs: Coney Island Overhaul Shop |
DBB (A+B) |
NYC Transit |
Component Upgrades at Various Bus Depots: Castleton, Michael J. Quill, Gun Hill, Jackie Gleason, Ulmer Park, Kings Bridge, Charleston, and Flatbush Depots |
DBB (A+B) |
NYC Transit |
Connection-Oriented Ethernet (COE), Phase 3C: System-wide |
DBB (A+B) |
NYC Transit |
Fire Stand Pipe Phase 2: Grand Central Terminal |
DBB (A+B) |
Metro-North Railroad |
Line Structure Component Repairs: Downtown Manhattan / Broadway and Nassau Lines |
DBB (A+B) |
NYC Transit |
Rehabilitate Garretson Ave Bridge, Overcoat 6 SIR Bridges (Thompson Street, Wave Street, Water Street, Bay Street, Prospect Street, and Canal Street), Rehabilitate Stapleton Viaduct, and SIR Station Component Program at 7 stations (St. George, Stapleton, Grasmere, Old Town, Dongan Hills, Grant City, Oakwood Heights) |
DBB (A+B) |
NYC Transit |
Rehabilitate Pump Rooms: 4 Locations / Broadway, Astoria, Brighton, and Canarsie Lines |
DBB (A+B) |
NYC Transit |
Rehabilitation of 6 Circuit Breaker Houses: Various Locations in Brooklyn and Queens |
DBB (A+B) |
NYC Transit |
Sandy Repairs: Power Repairs at Various Locations System-wide |
DBB (A+B) |
NYC Transit |
Sandy Resiliency (Outstanding Street Level Openings): Various Locations System-wide |
DBB (A+B) |
NYC Transit |
Sandy Resiliency and Drainage Improvements: Westchester Yard |
DBB (A+B) |
NYC Transit |
Second Avenue Subway Phase 2: Early Works / Utility Relocation |
DBB (A+B) |
C&D |
Structural Painting and Repair: Portal to Kings Hwy / Culver Line |
DBB (A+B) |
NYC Transit |
Substation Renewal: Washington Heights and Village |
DBB (A+B) |
NYC Transit |
Switch Replacement for CBTC 6 Avenue & 63rd St Lines |
Design-Build |
NYC Transit |
Switch Replacement for CBTC Fulton Line |
TBD |
NYC Transit |
Over $100 million
Project |
Method |
Agency |
---|---|---|
Communications Based Train Control (CBTC): 6 Av and 63rd St Lines |
Design-Build |
NYC Transit |
Sandy Repairs: Culver Yard |
DBB (A+B) |
NYC Transit |
Second Avenue Subway Phase 2: Tunnel Boring Machine and Caverns |
Design-Build |
C&D |
Station Component Repairs: Various Locations |
Design-Build |
NYC Transit |
Structural Painting and Repair: 225 St - 240 St / Broadway-7 Avenue Line and Queensboro Plaza - 33 St / Flushing Line |
DBB (A+B) |
NYC Transit |